PROJECT NO. 95-622 CITY HALL REMODEL – ADA
UPGRADES –
APPROVAL OF PLANS, SPECIFICATIONS AND ADVERTISE FOR
BIDS
Recommendation:
It is recommended that the City Council:
- Approve the plans, specifications, order the work and
call for bids; and
- Instruct the City Clerk to post a Notice Inviting
Sealed Bids for said project.
Background:
On November 28, 2000 the City Council
awarded construction management services to Concept Marine
Associates for the City Hall Remodel. The services included
pre-bid, bidding and construction phases of the project. The
pre-bid work consisted of a constructability review of the
project documents, a review of the city's plan for moving city
offices during the construction and finalizing new furniture
for the renovated facilities.
The constructability review was started
immediately. The constructability review report addressed the
following major items to be resolved:
- The documents did not provide a location for or proved
for relocation of the data server.
- The documents did not indicate the new modular furniture
to be installed on the second floor
- The documents did not provide for data or telephone lines
for the new office layouts on the lower or second floor of
City Hall and did not provide power connections for this
modular furniture.
- The new modular furniture plans were not complete and
required revisions to meet the users’ needs.
- There was no plan for relocating the City offices during
construction.
Staff met with the Architect on January 12,
2001 to go over the constructability review report. The
Architect agreed to most of the items in the report and agreed
to revise the documents as required. The project documents have
been completed and are now ready for the bid process.
The proposed work consists of the
following:
-
BASEMENT FLOOR – Complete
demolition and revision of this floor to accommodate the
Public Works Department. Add an HVAC System; provide ADA
Renovations; provide new ceilings, lighting, electrical
power and all finishes.
- GROUND FLOOR – No architectural renovations to this
floor. This floor has recently been renovated. Add an HVAC
System and provide ADA Renovations.
- SECOND FLOOR – Complete demolition and revision of
this floor to accommodate various City Offices. Add an HVAC
System; provide ADA Renovations; provide new ceilings,
lighting, electrical power and all finishes.
- ELEVATOR – New elevator, at a new location, to
serve all three floors.
- GROUND FLOOR PUBLIC BATHROOMS – Completely renovate
two bathrooms to accommodate ADA requirements.
- SECOND FLOOR BATHROOMS – Add two new ADA bathrooms
on this floor.
- MAIN ENTRANCE TO CITY HALL/COUNCIL CHAMBERS –
Completely revise the existing stairs and entrance
configuration.
- MAIN PARKING LOT – Completely revise the lot and
entrance ramp to City Hall to accommodate ADA
requirements.
- REAR ENTRANCE TO CITY HALL – Add new ramp to
accommodate ADA Requirements.
- COUNCIL CHAMBERS – Completely revise the Council
Chambers – Provide ADA Renovations – Provide new
HVAC System – Provide new ceilings, lighting,
electrical power and all finishes.
The plans and specifications are available
for review in the office of the Director of Public Works/City
Engineer.
Fiscal Impact:
There is no fiscal impact at this time.