AWARD PROFESSIONAL SERVICES AGREEMENT FOR
DESIGN & ENGINEERING OF STREET IMPROVEMENTS FOR PROJECT
NO. CIP 00-171 - ARDMORE AVENUE – VARIOUS LOCATIONS
AND PROJECT
NO. CIP 00-172 - 21ST STREET BETWEEN VALLEY DRIVE AND POWER
STREET
Recommendation:
It is recommended that the City
Council:
- Award Professional Services Agreement to CBM Consulting,
Inc. to provide design and engineering services for CIP No.
00-171 and CIP No. 00-172 in the amount of $50,174;
- Authorize the Mayor to execute and the City Clerk to
attest the attached Professional Services Agreement subject
to approval by the City Attorney; and
- Authorize the Director of Public Works to make changes to
the agreement up to $5,017.
Background:
Project No. CIP 00-171 and Project No. CIP
00-172 are small and similar street improvement projects and
were combined in the Request for Proposals (RFP) for design
purposes. Four proposals were received on December 6, 2000.
Proposals were received from the following firms:
FIRM
|
SCOPE OF WORK
|
SIMILAR PROJECT
EXPERIENCE
|
WORK SCHEDULE
|
FEE
|
1. CBM Consulting,
Inc.
|
Strong
|
Strong
|
Strong
|
$50,174
|
2. Uniplan Engineering
Inc.
|
Strong
|
Strong
|
Adequate
|
$78,522
|
3. DCA Civil Engineering
Group
|
Strong
|
Strong
|
Adequate
|
$88,496
|
4. RKA Civil Engineers
Inc.
|
Weak
|
Adequate
|
Weak
|
$35,678
|
Analysis:
CBM Consulting, Inc. showed strength in all
the categories. Staff recommends CBM Consulting, Inc. as the
most qualified and cost-effective choice for design
services.
The Scope of Services will consist of the
following work:
A.
Street Improvement Plans
Prepare one set of Street Improvement
Plans in accordance with the City’s Minimum Design
Standards per project. Process the improvement plans
through the City for final approval. Off-site improvements
will be required in some locations. Some sidewalks will
need to be reconstructed.
B.
Construction Cost Estimate
Upon submittal and approval of the
improvement plans, a cost estimate reflecting the proposed
improvements shall be submitted to the City for each
project.
D.
Field Review
Prior to commencing the design of the
improvement plans, a field review of each project site
shall be conducted to verify any field changes. Mileage is
included.
E.
Specifications
Upon submittal of the improvement plans,
one set of specifications per project shall be included
with the package.
F.
Soils Testing
Provide the soils testing and
recommendations for the Structural Sections of the proposed
streets to be reconstructed.
G.
Design Survey
Perform Preliminary Design Survey of the
existing utilities, driveways, poles, sidewalks, etc. and
Topography Map for the purpose of the final design.
The complete Scope of Services can be found
in the attached Professional Services Agreement.
Fiscal Impact:
The cost of design will be charged as
follows:
-
Project CIP No. 00-171
-
Ardmore Ave., Various Locations $35,000
-
Project CIP No. 00-172 - 21st St.
Between Valley Dr. and Power St.
$15,174
TOTAL $50,174
Funding is available for both project
budgets; therefore, there is no fiscal impact at this time.
Alternatives:
- Approve Staff’s recommendation.
- Reject proposal and send back to Staff for downscale of
project.
- Take no action.