City of Hermosa Beach --- 09-12-00

CIP 99-409 MANHOLE REPAIR/RECONSTRUCTION
24TH STREET, BEACH DRIVE AND THE STRAND

 

Recommendation:

It is recommended that the City Council:

  1. Approve the plans, specifications, estimates, order the work and call for bids; and
  2. Instruct the City Clerk to issue Notice Inviting Bids for said project.

 

Background:

The existing sewer main runs diagonally under 2330, 2338 and 2340 The Strand to a manhole on Beach Drive. The reason the 8" sewer main crosses these properties is to satisfy the minimum slope required for a sewer to flow between the manholes at The Strand and Beach Drive. This sewer main is now in conflict with the development of the property at 2338 the Strand. Therefore, it is recommended that the City re-route the sewer line to the public right-of-way and meet the minimum slope requirement by increasing the sewer line size from 8" concrete pipe to 18" PVC (polyvinyl chloride pipe).

The proposed scope of the construction work is outlined below:

The work consists of construction of a new 18" sewer line on 24th Street, between The Strand 70' east to Beach Drive and from this point 110' south to the first manhole on Beach Drive. In addition, the construction of five (5) service laterals, two (2) manholes and restoration of trenches and asphalt concrete overlay will be constructed on Beach Drive within the project limits.

Plans, specifications and estimates for the project prepared by JMC2 Consultants are available in the office of the City Engineer for review.

 

Fiscal Impact

The Engineer’s estimate for construction is $60,000. The current project budget for Sewer Manhole Rehabilitation/Construction is $103,925 (160-8409-4201).