CITY COUNCIL COMMENTS:
JULIE OAKES
-
Remove the paving under the picnic
tables and use DG instead. Concern regarding the creation
of lips or offsets due to concrete.
- Remove the paving down to the fire pit and the
tables.
- Make the fire pit smaller.
- Use bollards on the paths for lighting.
J. R. REVICZKY
- Define the scope of work for bid alternate 2.
- Provide a detail engineer’s estimate based on
quantity takeoffs for irrigation system rather than based on
square footage.
- Submit manufacturer’s catalogs and/or shop drawings
for the automatic controller and central computer system (bid
item #18).
- What is the acreage of the park?
- Submit catalogs, drawings, and cost for all playground
equipment.
- Define the scope of weed abatement (bid item #44)
- Define the scope of hydroseed turf.
- Define and clarify the 90 day maintenance period (bid
item #46).
- Submit manufacturer’s catalogs for lighting
fixtures.
- Not satisfied with two separate electrical feeding
systems. Therefore, look into combining them into one
system.
KATHY DUNBABIN
- Handicap path should continue to Amphitheater and picnic
ground. I am sure it does, but it was not marked on the
plans.
- Lights needed on north sidewalk
- We need to ensure that the restroom is well
ventilated.
SAM EDGERTON
- Does the basketball hoop go up and down?
- Describe in detail on polyfelt and silicon at boulder
edge.
- Concrete seat? Where?
- Concrete pads under the picnic table.
- How much of the soccer field is being landscaped?
- Define the scope of work for bid alternates.
- Submit catalogs, drawings, and cost for all playground
equipment.
General Questions/Comments:
- Provide takeoff information for cost breakdown.
- Show page numbers for all call outs.
- Tech specifications for irrigation and lighting in
diskette.